Who was in charge of Damage Control?

The Engineer’s Office just forward of the after funnel was Damage Control HQ. The forward section base was in the cross passage fwd (yellow damage control locker & red firefighting locker at frames 70-73) and after section base at the aft end of the after canopy (yellow damage control locker & red firefighting locker at frames 164- 165)

Loading...