The Engineer’s Office just forward of the after funnel was Damage Control HQ. The forward section base was in the cross passage fwd (yellow damage control locker & red firefighting locker at frames 70-73) and after section base at the aft end of the after canopy (yellow damage control locker & red firefighting locker at frames 164- 165)

